翻訳と辞書
Words near each other
・ USS Nathanael Greene (SSBN-636)
・ USS Nathaniel Taylor (1863)
・ USS Natick
・ USS Natoma (SP-666)
・ USS Natoma Bay (CVE-62)
・ USS Natoya (SP-396)
・ USS Natrona (APA-214)
・ USS Naubuc
・ USS Naubuc (1864)
・ USS Naubuc (AN-84)
・ USS Naugatuck
・ USS Naugatuck (YTM–753)
・ USS Naumkeag (1863)
・ USS Nauset (AT-89)
・ USS Nausett
USS Nausett (1865)
・ USS Nausett (IX-190)
・ USS Naushon (SP-517)
・ USS Nautilus
・ USS Nautilus (1799)
・ USS Nautilus (1838)
・ USS Nautilus (SS-168)
・ USS Nautilus (SSN-571)
・ USS Nautilus II (SP-559)
・ USS Navajo
・ USS Navajo (AT-52)
・ USS Navajo (AT-64)
・ USS Navajo (ATA-211)
・ USS Navajo III (SP-298)
・ USS Navarro (APA-215)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

USS Nausett (1865) : ウィキペディア英語版
USS Nausett (1865)

USS ''Nausett'', a single-turreted, twin-screw monitor, was built by Donald McKay, South Boston, MA, and launched on 26 April 1865, and commissioned on 10 August 1865, Acting Master Win. U. Grozier in command. Soon after her commissioning, she steamed to New York, NY, where she decommissioned on 24 August 1865, and was laid up at the New York Navy Yard.
''Nausett'' was a ''Casco''-class, light-draft monitor intended for service in the shallow bays, rivers, and inlets of the Confederacy. These warships sacrificed armor plate for a shallow draft and were fitted with a ballast compartment designed to lower them in the water during battle.
==Design Revisions==
The contract to Donald McKay was originally announced in 1863. Though the original designs for the ''Casco''-class monitors were drawn by John Ericsson, the final revision was created by Chief Engineer Alban C. Stimers following Rear Admiral Samuel F. Du Pont's failed bombardment of Fort Sumter in 1863. By the time that the plans were put before the Monitor Board in New York City, Ericsson and Stimers had a poor relationship, and Chief of the Bureau of Construction and Repair John Lenthall had little connection to the board. This resulted in the plans being approved and 20 vessels ordered without serious scrutiny of the new design. $14 million US was allocated for the construction of these vessels. It was discovered that Stimers had failed to compensate for the armor his revisions added to the original plan and this resulted in excessive stress on the wooden hull frames and a freeboard of only . Stimers was removed from the control of the project and Ericsson was called in to undo the damage. He was forced to raise the hulls of the monitors under construction by to make them seaworthy.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「USS Nausett (1865)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.